Clark Park East Replacement consists of the demolition and disposal of existing curb, a drinking fountain and a pool. Tree protection, excavation, backfilling, subgrade preparation, paving, drainage works, site furnishings as well as soft and hard landscaping are also part of the scope of work. This park features a design-build log jam play equipment with custom stainless steel slides, two crazy cups, accessible sand digger and a sand conveyor belt.
Project Value: $ 421,000.00
Contract Date: Dec 2017 – Apr 2018