Newton Town Centre Detention Pond – Surrey, BC 2016

Newton Town Centre Detention Pond located in the City of Surrey involves the installation of storm and sanitary sewers, pond excavation including erosion and sediment control, a sierra wall with fencing and detailed landscaping which includes seeding and planting of shrubs and trees.

  • 3.75 Hectares of Construction Area
  • 57,000 m3 Pond Excavation
  • 184 m2 Mechanically Stabilized Earth Wall
  • Storm Sewer
  • Flow Control Manholes and Headwalls
  • Trail Construction
  • Pavement Removal and Restoration
  • Re-Vegetation and Detailed Landscaping

Project Value: $ 2,386,400.00

Contract Date: May 2015 – October 2016